Quick Answer: The best way to farm Stellar Jade in HSR is to complete Daily Training every day, clear limited-time events first, push Memory of Chaos, Pure Fiction, and Apocalyptic Shadow, finish quests and exploration, redeem codes, and save Jades for limited banners. F2P players should prioritize consistent rewards and avoid low-value pulls.
Important update note: This guide avoids fixed “total Jades per version” claims because event rewards, banner dates, and version rewards change. For Version 4.3 and later patches, check the official HoYoverse update notice before adding current event totals.
Stellar Jade is the resource that decides whether you can pull the character you want in Honkai: Star Rail. You can collect some naturally by playing, but if you want limited characters, reruns, or signature Light Cones without spending heavily, you need a clear HSR Stellar Jade farm plan.
In my experience, the biggest problem for F2P players is not always bad luck. It is usually poor planning: skipping events, forgetting Daily Training, pulling on banners without checking pity, or farming the wrong content when a banner is about to end.
This guide focuses on the practical questions players actually ask: how much Jade can I get per day, how many pulls can I save, where should I farm first, and what should I do if I am short before a banner ends?
If you are still early in the game, start with smart account progression first. Our Honkai Star Rail beginner guide explains how to avoid wasting early resources while unlocking more Jade sources.

Image: Honkai: Star Rail © HoYoverse
Contents
- 1 🧭 Best Ways to Farm Stellar Jade in HSR
- 2 ⏱️ 10-Minute Daily Stellar Jade Routine
- 3 🧮 How Much Stellar Jade Can You Farm as F2P?
- 4 🧾 Stellar Jade Farming Priority by Account Stage
- 5 🚀 Fastest Stellar Jade Farm Route for New Players
- 6 🆘 Emergency Jade Farming Before a Banner Ends
- 7 🎟️ Stellar Jade Pull Math: How Many Pulls Do You Need?
- 8 🎯 How to Use Banner History for Stellar Jade Planning
- 9 🌌 Should You Spend Stellar Jade on Light Cones?
- 10 🚦 Pull or Save Decision Table
- 11 ⚠️ Common Stellar Jade Farming Mistakes
- 12 ❓ FAQ: HSR Stellar Jade Farm
- 12.1 What is the fastest way to farm Stellar Jade in HSR?
- 12.2 How much Stellar Jade do you get from Daily Training?
- 12.3 Can I farm enough Stellar Jade before a banner ends?
- 12.4 How many Stellar Jades do I need for 10 pulls?
- 12.5 Should F2P players spend Stellar Jade on Standard Warp?
- 12.6 Are events more important than exploration for Stellar Jade?
- 12.7 Should I use Stellar Jade to refill Trailblaze Power?
- 12.8 Should I pull for signature Light Cones as F2P?
- 13 📚 Sources & Update Notes
🧭 Best Ways to Farm Stellar Jade in HSR
The best HSR Stellar Jade farm is not one single method. It is a priority system. Some Jade sources are daily and predictable. Some are limited-time and disappear. Some are one-time rewards that are amazing for new players but cannot be repeated forever.
For a broader resource route beyond Stellar Jade, you can follow our Honkai Star Rail farming guide, especially if you are also planning relics, EXP, traces, and team upgrades.
| Priority | Jade Source | Best For | Why It Matters |
|---|---|---|---|
| 1 | Daily Training | All players | Reliable daily Jade income |
| 2 | Limited-time events | F2P and low-spend players | High-value rewards that expire |
| 3 | Endgame modes | Mid-game and endgame players | Repeatable Jade from account strength |
| 4 | Story, quests, exploration | New and returning players | Large one-time Jade pool |
| 5 | Codes, mail, check-in rewards | Everyone | Easy bonus rewards, often time-sensitive |
| 6 | Achievements | Completionists | Small rewards that add up slowly |
My practical rule: If you have limited time, clear expiring content first. Daily Training is stable, but missed event rewards are gone once the event ends.

Image: Honkai: Star Rail © HoYoverse
✅ Daily Training
Daily Training is the foundation of every Stellar Jade farming plan. It is quick, consistent, and available every day after you unlock the system.
The key number is simple: Daily Training gives 60 Stellar Jade per day when you claim all activity rewards. That means it is not just a “daily task” system. It is your baseline pull income.
| Daily Training Period | Stellar Jade | Approx. Pulls | Planning Use |
|---|---|---|---|
| 1 day | 60 | 0.38 pull | Small daily progress |
| 7 days | 420 | 2.6 pulls | Weekly baseline |
| 14 days | 840 | 5.25 pulls | Useful before banner end |
| 30 days | 1,800 | 11.25 pulls | Monthly planning |
| 42 days | 2,520 | 15.75 pulls | Approx. six-week baseline |
Why this matters: Daily Training alone will not guarantee every limited character, but it gives you a predictable baseline. If you skip it for two weeks, you lose 840 Stellar Jade, which is more than five pulls.
🎁 Events, Codes, Mail & Check-In Rewards
Events are usually the highest-priority farm when a banner is active. Unlike exploration, events expire. From a planning perspective, limited-time event rewards should be treated as part of your banner budget, not optional side content.
| Reward Source | Priority | Why It Matters | Best Timing |
|---|---|---|---|
| Version events | Very high | Often one of the largest patch-based Jade sources | Clear before the final week |
| Livestream codes | High | Free rewards but usually time-limited | Redeem immediately |
| Maintenance mail | High | Easy Jade after updates | Claim after version update |
| HoYoLAB check-in | Medium | Small bonus rewards over time | Use as extra, not core income |
| Web events | Medium | Often missed by players who only check in-game menus | Check official channels |
Do not delay events until the last day. If your account is underbuilt, some event stages may take longer than expected. Clear the easy reward tiers early, then return for optional objectives later.
⚔️ Endgame Modes
Memory of Chaos, Pure Fiction, and Apocalyptic Shadow turn your account strength into recurring Stellar Jade. You do not need perfect teams to benefit from them. Even partial clears matter, especially for F2P players.
| Mode | What It Tests | Jade Farming Goal | F2P Advice |
|---|---|---|---|
| Memory of Chaos | Boss and elite damage checks | Push as many stages as your teams allow | Build two stable teams before chasing luxury upgrades |
| Pure Fiction | AoE damage and wave clearing | Use AoE carries and fast cycling teams | Do not force single-target teams into AoE content |
| Apocalyptic Shadow | Boss mechanics and weakness control | Match teams to boss mechanics | Learn the scoring mechanic before upgrading randomly |
If your account cannot clear enough endgame rewards yet, it is usually a team-building issue rather than only a relic issue. Our low-investment F2P team guide can help you build usable teams without depending on every limited 5-star.
Endgame mindset: Do not wait until your account is perfect. Clear what you can, identify the bottleneck, upgrade the highest-impact character, then try again before reset.

Image: Honkai: Star Rail © HoYoverse
🗺️ Exploration, Missions & Achievements
Exploration is one of the best emergency Jade pools for new and returning players. Chests, puzzles, side quests, hidden objectives, and achievements can quickly become several extra pulls if your account has unfinished regions.
The catch is that exploration is mostly one-time. Once you clear a map, it stops being a repeatable income source. That is why active endgame players usually have more predictable income, while new players have more emergency farming potential.
| One-Time Source | Best Use | Speed | Notes |
|---|---|---|---|
| Main story | Unlock systems and regions | Medium | Highest priority for new players |
| Adventure missions | Emergency Jade before banner ends | Medium | Good for returners with unfinished content |
| Chests and puzzles | Map cleanup | Fast to medium | Best with a checklist or interactive map |
| Permanent modes | One-time reward cleanup | Medium to slow | Push only as far as your account allows |
| Achievements | Extra Jade when other sources are done | Slow | Useful but not the first emergency route |
⏱️ 10-Minute Daily Stellar Jade Routine
A strong HSR Stellar Jade farm plan should work even on busy days. You do not need to play for hours. You need to finish the actions that protect your daily and event income.
For a cleaner checklist-style version, you can pair this with our daily routine checklist.
| Step | Action | Time Cost | Why It Matters |
|---|---|---|---|
| 1 | Complete Daily Training | 2–4 minutes | Locks in the daily 60 Jade baseline |
| 2 | Spend Trailblaze Power | 2–3 minutes | Improves teams for endgame rewards |
| 3 | Check current events | 1 minute | Prevents missing limited-time Jade |
| 4 | Claim mail, codes, and assignments | 1 minute | Collects easy rewards and resources |
| 5 | If extra time: clear one quest, map route, or endgame attempt | Optional | Turns spare time into extra pulls |
Daily checklist:
- Claim all Daily Training activity rewards.
- Spend Trailblaze Power before it caps.
- Check event deadlines before logging off.
- Redeem codes as soon as you see them.
- Do not spend Stellar Jade unless you know your pity and next target.

Image: Honkai: Star Rail © HoYoverse
🧮 How Much Stellar Jade Can You Farm as F2P?
This is the part many Stellar Jade guides miss. Players do not only want to know where Jade comes from. They want to know whether they can realistically reach another 10-pull, 20 pulls, or pity before a banner ends.
The safest evergreen estimate is to separate fixed daily income from variable version income. Daily Training is stable. Event totals, endgame reward changes, login campaigns, and version compensation must be checked every patch.
| Source Type | Example Sources | Estimate Style | Planning Use |
|---|---|---|---|
| Fixed daily baseline | Daily Training | 60 Stellar Jade per day | Use for daily, weekly, and monthly planning |
| Version-limited income | Events, login campaigns, maintenance mail | Changes by patch | Check official update notes before estimating |
| Rotating endgame income | MoC, Pure Fiction, Apocalyptic Shadow | Depends on clear progress | Estimate based on your actual stars/score |
| One-time account income | Story, quests, exploration, achievements | High for new accounts, low for cleared accounts | Best emergency farming pool |
| Bonus income | Codes, web events, check-in rewards | Small but useful | Claim quickly and do not rely on it alone |
📊 F2P Jade Income Estimate by Player Type
| Player Type | Best Jade Sources | Emergency Potential | Planning Use |
|---|---|---|---|
| New Player | Story, exploration, quests, tutorials, permanent content, current events | Very high | Best emergency farming potential because many one-time rewards are still available |
| Returning Player | Current events, unfinished maps, old quests, endgame resets, mail/codes | High | Good short-term catch-up if you have skipped several patches |
| Active Endgame Player | Daily Training, version events, MoC, Pure Fiction, Apocalyptic Shadow, version rewards | Medium | More predictable income, but less one-time Jade left to farm |
| Casual F2P | Daily Training plus events only | Low to medium | Stable but slower; you may need to skip more banners |
Planning example: If you need 20 more pulls, that is 3,200 Stellar Jade. Daily Training alone needs more than 50 days to cover that gap, so you should look at events, unfinished quests, exploration, and endgame rewards first.

Image: Honkai: Star Rail © HoYoverse
🧾 Stellar Jade Farming Priority by Account Stage
Your best Stellar Jade route depends on account stage. A beginner should not farm like an endgame player. A returning player should not ignore unfinished maps. An endgame player should not expect exploration to keep funding every banner forever.
| Account Stage | First Priority | Second Priority | Avoid |
|---|---|---|---|
| Beginner | Story + current events | Exploration and tutorials | Random Light Cone pulls |
| Mid-game | Daily Training + team building | MoC/PF/AS partial clears | Pulling every DPS |
| Endgame | Rotating endgame modes | Version events and banner planning | Overinvesting in luxury cones |
| Returning | Current events | Unfinished maps and quests | Ignoring event deadlines |
From a planning perspective: The less content you have cleared, the more emergency Jade you can farm. The more complete your account is, the more important consistent saving and smart banner selection become.
🚀 Fastest Stellar Jade Farm Route for New Players
If you just started HSR and want pulls quickly, your best route is not achievement hunting. You want to unlock systems, clear current limited rewards, and open the largest one-time Jade pools first.
Best New Player Route
- Progress the main story until key systems unlock. This opens Daily Training, events, more regions, and account progression.
- Clear current limited-time events as soon as possible. Even partial event progress is better than missing the rewards completely.
- Finish high-value quests and tutorials. Many early systems reward you for simply learning and progressing.
- Open chests and solve puzzles while moving through maps. Do not spend hours on tiny achievement rewards before collecting obvious map rewards.
- Push permanent modes only as far as your account allows. Stop when the time cost becomes too high for your current team strength.
- Claim codes, mail, check-in rewards, and update compensation. These are easy rewards, but many are time-limited.
- Do not spend Stellar Jade on Standard Warp. Save for limited character banners unless you have a very specific reason.
Beginner mistake: Do not chase every banner just because your early account gets many Jades. Early-game rewards feel huge, but they are not renewable forever.
🆘 Emergency Jade Farming Before a Banner Ends
If a banner is ending soon and you are short on pulls, you need speed. This is where the farming order changes. Long-term habits are still important, but emergency farming should focus on the fastest remaining rewards on your account.
How Much Jade Are You Missing?
| Missing Pulls | Stellar Jade Needed | Daily Training Alone | Emergency Advice |
|---|---|---|---|
| 5 pulls | 800 Jade | About 14 days | Check events, mail, quests, and quick exploration |
| 10 pulls | 1,600 Jade | About 27 days | Prioritize unfinished events and one-time content |
| 20 pulls | 3,200 Jade | About 54 days | You need events, exploration, quests, and possibly endgame rewards |
| 30 pulls | 4,800 Jade | About 80 days | Usually not realistic from daily income alone before one banner ends |
Fastest Emergency Farm Order
| Priority | Farm This First | Why | Best For |
|---|---|---|---|
| 1 | Current limited-time events | High-value and time-limited | Everyone |
| 2 | Unclaimed mail, codes, login rewards | Fastest possible rewards | Everyone |
| 3 | Unfinished story and side quests | Reliable one-time rewards | New and returning players |
| 4 | Exploration cleanup | Chests and puzzles can add up quickly | Accounts with unfinished maps |
| 5 | MoC/PF/AS partial clears | Good if your teams are close | Mid-game and endgame players |
| 6 | Achievements | Useful but slower | Only after faster sources are done |
Emergency rule: If you are short before a banner ends, do not start with tiny achievements. Start with event rewards, unfinished quests, exploration, and any endgame rewards you can realistically claim.

Image: Honkai: Star Rail © HoYoverse
🎟️ Stellar Jade Pull Math: How Many Pulls Do You Need?
The basic conversion is simple: 160 Stellar Jade = 1 pull. That means one 10-pull costs 1,600 Stellar Jade.
| Pull Target | Stellar Jade Needed | What It Means |
|---|---|---|
| 1 pull | 160 Jade | Single pull |
| 10 pulls | 1,600 Jade | One multi-pull |
| 30 pulls | 4,800 Jade | Small chance, not a safe plan |
| 50 pulls | 8,000 Jade | Good progress toward pity |
| 75 pulls | 12,000 Jade | Serious banner attempt range |
| 90 pulls | 14,400 Jade | Hard pity budget for one 5-star attempt |
| 180 pulls | 28,800 Jade | Worst-case limited character guarantee budget |
Before pulling, count more than your visible Jade number. You should also count Special Passes, pity, guarantee status, event rewards still available before the banner ends, and unfinished one-time content.
A simple HSR pull tracker makes this much easier because it helps you see whether you are actually close to pity or just emotionally close to pulling.
Planning tip: If you are F2P, do not judge a banner by “Can I do one 10-pull?” Judge it by “Can I reach pity without ruining the next banner I care about?”

Image: Honkai: Star Rail © HoYoverse
🎯 How to Use Banner History for Stellar Jade Planning
Banner history matters, but this article is not a dedicated banner archive. For this Stellar Jade guide, the practical goal is simple: use banner patterns to avoid wasting Jades right before a better banner appears.
For current and past banner tracking, use our HSR banner history page and update it whenever official HoYoverse announcements confirm a new version.
| Banner Situation | What to Check | Stellar Jade Decision | F2P Note |
|---|---|---|---|
| New limited character | Role, path, element, team value, banner end date | Pull only if they solve a real account need | Do not pull only because the character is new |
| First rerun | How the character performed since release | Often safer than release-day hype | Good time to pick a proven unit |
| Support rerun | Team flexibility and long-term value | Usually worth serious consideration | Supports often age better than DPS units |
| DPS rerun | Current meta, relic demand, support requirements | Pull only if you can build the team | A DPS without the right supports may disappoint |
| Banner before a major update | Official livestream, drip marketing, upcoming roles | Wait if you are unsure | Information is valuable for F2P planning |
My experience: F2P accounts usually get more long-term value from flexible supports, sustain units, and team-enabling characters than from pulling every new DPS.

Image: Honkai: Star Rail © HoYoverse
🌌 Should You Spend Stellar Jade on Light Cones?
Light Cone banners are tempting because the upgrade looks clear. But for many F2P players, a new character or key support will improve the account more than a signature Light Cone.
Before spending Jades on a weapon-style upgrade, compare your options with our Light Cone guide, especially if there are strong F2P or 4-star alternatives.
| Light Cone Situation | Pull Value | F2P Decision | Why |
|---|---|---|---|
| Signature for your favorite long-term main | Medium to high | Consider only if your character roster is stable | Worth more if you will use that character for many patches |
| Universal support Light Cone | High if many units can use it | More reasonable than niche cones | Account-wide value matters |
| Niche DPS Light Cone | Account-dependent | Usually skip | May only help one team |
| You still lack core sustain/support units | Low | Save | Characters usually unlock more team options |
| You are pulling only for 4-star Light Cones | Risky | Avoid unless you accept the risk | 4-star targeting can drain Jade fast |
F2P warning: A Light Cone can increase damage, but a missing support or sustain can block your whole account. Pull characters first unless the Light Cone is clearly part of a long-term plan.
🚦 Pull or Save Decision Table
This is the table I would use before spending Stellar Jade. It is simple, but it prevents most bad pulls.
| Situation | Pull or Save? | Reason | Best Action |
|---|---|---|---|
| You lack a reliable sustain | Pull if a strong sustain is available | Sustain improves many teams and endgame consistency | Prioritize account stability |
| You already have two strong DPS units | Usually save | Another DPS may not improve clears much | Wait for support, sustain, or team enabler |
| You love the character and have enough pulls | Pull | Enjoyment matters if your budget is safe | Set a hard stopping point before pulling |
| You are on 50/50 with low savings | Usually save | The risk is high if you also want the next banner | Farm more and wait for official banner info |
| The banner ends soon and you are close to pity | Maybe pull | Depends on guarantee and future target | Check pity, guarantee, and next banner first |
| You only want the signature Light Cone | Usually save | Characters often provide more account value | Use F2P or 4-star alternatives if available |
| You cannot clear endgame due to weak teams | Pull selectively | The right unit can unlock more recurring Jade | Pull for team function, not hype |
Simple rule: Pull when a character solves a real account problem. Save when the banner only gives you a short-term dopamine hit.

Image: Honkai: Star Rail © HoYoverse
⚠️ Common Stellar Jade Farming Mistakes
❌ Mistake 1: Pulling Without Checking Pity
Never pull just because you have 1,600 Stellar Jade. Check pity, guarantee status, banner duration, and your next target first. A “random 10-pull” can easily ruin a future plan.
❌ Mistake 2: Skipping Events Until the Last Day
Events are time-limited. If you wait too long, you may lose Jades permanently. Clear the main reward path early, then return later for optional cleanup.
❌ Mistake 3: Spending Stellar Jade on Standard Warp
For most F2P players, Stellar Jade should go toward limited banners. Standard Warp progresses over time through regular Star Rail Passes, so using premium Jade there is usually poor value.
❌ Mistake 4: Pulling Every DPS
A new DPS is exciting, but too many DPS units can leave your account without enough supports, sustain units, or team structure. That often hurts endgame Jade income.
❌ Mistake 5: Ignoring Team Building
More characters do not automatically mean more rewards. You need teams that can actually clear content. If your account feels messy, review this team building guide before deciding your next pull.
❌ Mistake 6: Overvaluing Signature Light Cones
A signature Light Cone can be strong, but it should not block you from getting core characters. For F2P players, Light Cone banners are usually luxury decisions, not default decisions.
❓ FAQ: HSR Stellar Jade Farm
What is the fastest way to farm Stellar Jade in HSR?
The fastest way depends on your account. For new and returning players, current events, story quests, unfinished maps, and exploration are usually fastest. For active endgame players, Daily Training, events, and rotating endgame modes are more reliable.
How much Stellar Jade do you get from Daily Training?
Daily Training gives 60 Stellar Jade per day when you claim all activity rewards. That equals 420 Jade per week, 1,800 Jade in 30 days, and about 2,520 Jade across a 42-day period.
It depends on how many pulls you are missing and how much unfinished content your account has. If you are short 5–10 pulls, events, quests, mail, codes, and exploration may be enough. If you are short 20–30 pulls, Daily Training alone is usually too slow before one banner ends.
How many Stellar Jades do I need for 10 pulls?
You need 1,600 Stellar Jade for 10 pulls because one pull costs 160 Stellar Jade. For 90 pulls, you need 14,400 Jade. For a worst-case 180-pull limited character guarantee, you need 28,800 Jade.
Should F2P players spend Stellar Jade on Standard Warp?
Usually no. F2P players should save Stellar Jade for limited Character Event Warps. Standard Warp can be progressed over time with regular Star Rail Passes, while limited banners are where Stellar Jade has the most strategic value.
Are events more important than exploration for Stellar Jade?
Events are usually more urgent because they expire. Exploration is very valuable, especially for new or returning players, but it can normally wait. If both are unfinished, clear limited-time event rewards first.
Should I use Stellar Jade to refill Trailblaze Power?
For F2P players, usually no. Trailblaze Power refills can speed up farming materials, but they reduce your pull budget. Unless you spend money or have a specific reason, saving Stellar Jade for limited pulls is safer.
Should I pull for signature Light Cones as F2P?
Most F2P players should be careful. Signature Light Cones can be strong, but characters usually create more account value. Consider a signature Light Cone only if the character is a long-term core and you can still afford future banners.
📚 Sources & Update Notes
This guide is written as an evergreen Stellar Jade farming and planning guide. Exact event rewards, banner names, current version dates, and update compensation should be checked again before publishing or refreshing the article.
- Official HoYoverse Version 4.3 Update Details: Version 4.3 “The Lethe Below the Living” Update Details
- Stellar Jade item reference: Honkai: Star Rail Wiki — Stellar Jade
- Banner schedule cross-check: Game8 — Current and Upcoming Warp Banners